Best POP Service Providers of Ghaziabad
Select Your Requirements

About POP Services

Asaan home provides all types of house construction services, and among these services, POP and the false ceiling is the most asked services by clients. We have a team of experienced service providers who know how to construct false ceilings, grid ceilings, metal ceilings. PVC panels, etc.  POP is basically plaster of Paris and is known as false ceiling usually done to make the bedroom and another area of your home decorative. POP has the quality of easily mixing up with water, and malls, commercial areas, residential areas look for POP services to enhance the look.

There is first time in India, we deliver information of POP design pictures along with description of materials used in any design and tentative rates for those POP designs, from which customers can choose the design suitable to them. 

If you are looking for POP contractors who can change the look of your ceilings with POP services, look no further than us. Moreover, you have come to the right place because we have served many clients by offering them POP services.

We know people invest with the expectation of getting the desired outcomes. Our company offers everything from painting services to simple POP design.  Asaan House is an emerging tech base company in all kinds of POP and other construction related services.

POP/Putty terms and conditions

The portal provides you with the tentative labour rates along with the required material list considering 10 X 10 square feet area. The rates can be differentiated as per the actual area size. 

Once the physical inspection and settlement of final labour is done, service providers provide the list of required items to start the work. Clients can buy the required material from wherever they want. Service providers do not have any direct and indirect involvement in this. 

The required material needs to be unloaded where the actual work needs to be done. Any kind of higher side loading/unloading/shifting charges is not covered in the settled labour. 

The portal provides you with the tentative labour charges of the work as per the work needs to be done and the design selected by the clients. Final rates of the work would be informed after the physical inspection of the site. 

If customers want normal POP/Patching work on the roof and want to made any specific design in any specific area like L shape design at the roof or any other design, It would be done separate measurement of your wall and normal pop charges would be apply where normal work done and false ceiling charges would apply where false ceiling work done. Separate measurements would be done, and separate charges would be apply as per the selected design.

If customers choose any false ceiling design which covered the entire roof, it would apply false ceiling charges for the complete roof. 

Portal suggests the customers, the rates of False Ceiling only. If they want any wooden work in false ceiling, this is not covered in false ceiling rates. It would be informed after the visit by the carpenter. 

In case of height above then 11 feet, extra scaffolding charges would apply, and it would be informed after the physical inspection. 

In the case of plaint putty work on the walls, 2 quotes of putty would be applied only. In case of customer demands for separate Putty & POP panning work, the charges of the same are as follows.  

Putty-04 per sq feet
Pop panning-05 per sq feet

 

Payment Terms & Conditions

Question 1 : How will I make the payment of my complete project?

Answer: Website provides the tentative labour of your project subject to applicable terms and conditions. On the first visit of service providers, they will cross verify the details filled by you in the portal and inform the final actual labour of your project and will settle steps of jobs and percentage (%) of payment in below mentioned format.

Steps Percentage (%) of payment Break up of job
01 10%  
02 20%  
03 30%  
04 40%  
05 50%  
06 60%  
07 70%  
08 80%  
09 90%  
10 100%  

After settlement of labour, the company asks for a 20% advance security deposit. This amount will be kept with the company till the project completion and would adjust in the last & final payment of the project. Company keeps this amount as a security deposit & settlement purposes during the project.  


Customers can release the rest 80% payment to the service providers as per the decided steps of work. Security deposit of 20% will be adjusted at the end & finalization of project.


Question 2: What if After physical inspection, I am not satisfied with the provided labour charges or anything else and I want to deny to proceed ahead.

Answer: Yes absolutely, no issue. If you are not satisfied and you want to deny to give the approval, in that case only minimum visit charges @200/- would be chargeable and the lead will be closed.  


Question 3: What if I want to add or remove any work during the running project. Am I able to revise my job & labour during the running project?

Answer: Yes, website has an option to add or remove the work and re-design the total labour, so no worry about work and payment fluctuation during the job. 

 
Question 4: What if, the work holds from the customer end due to any trouble like financial, payment arrangement, office/job troubles, health issues of someone in my know.

Answer: In case of any pre-known troubles like financial, payment arrangements, office/job troubles etc. Customers are highly advised to inform the company/service providers before 7 days of trouble arrives so that the company can search new work for the service providers and can accordingly manage their schedule. In the hold days of service providers, they lost their productivity and outcome. In that hold period service providers are unable to accept any new job and if they leave the previous site un-complete, previous customers also blame them and its book the loss of service providers. Hence, If customers ignore this guideline and do not give the advance intimation, minimum charges of Rs. 500/- per day for technician and Rs. 250/- per day for helper would be chargeable for hold period only. These holding charges are applicable for regular/continuous work like construction work, flooring work, painting, POP etc. Part wise work like plumbing; electricians are not covered in this.

Customers are also advised to discuss with company/service providers if any financial trouble can arrive during the project at the first visit of service providers so that they can accordingly set up the steps of jobs & payment stages accordingly.

In case of any sudden issue like health related to the customer and in their know, the service provider/company will ask from the customer for how many days the work can be on hold. If the hold days exceed more than 3 days, the service providers are authorized to leave the site and take a new booking. Minimum charges for hold are not applicable for those 3 days.  

Question 5:What if my work holds due to government holidays like Diwali, Holi, Rakhsabandhan, Eid, Lohri, Christmas etc.  

Answer: Big festivals like Diwali, Holi, Rakshabandhan, 2 October, 15 August, 26 January for hindues  , choti&badi Eid for muslims& Christmas for christens  would not count in hold days. Any government restrictions like curfew, lockdown etc. will not count in hold days.    

Question 6:What if my work holds due to non-availability of working flow at site?  

Answer: In case of non-availability of working flow at site, minimum holding charges on per day basis are not applicable. 

Question 7: What if my work holds from the service provider’s end?  

Answer: If work holds from service provider’s end or service providers stopped giving response to the customer, company will wait for 5 working days of the service provider. In that period company will try to establish the connection with service provider. If connection established and service provider start responding to the company/customer, company will ask the reason of non response, if reason found genuine/considerable, company will re-start the work with the prior approval of customer. If service providers do not give the response or an untraceable, the company will appoint new service providers on that site after 5 working days, such type of non-responsive activity will give a negative impact on the previous service provider performance.    

Question 8: In case of any part work, how will my labour settle and how will i get my balance refund if any?  

Answer: If the work stopped in middle and part payment needs to be settled, In that case if working service provider is in contact with us, company representative will conduct a visit with working service provider at customer site and would settle the labour in consideration of all the parties (customer, service provider & company representative). If the working service provider is not in contact with the company, our representative will only visit the customer's site and settle the labour.  Except settled labour balance payment will be refunded to the customer in 7 working days. 

Question 9: What if I have a shortage of funds and I want any part work, is there any procedure for that?    

Answer: Yes there is a procedure for that also and it has explained in work terms and conditions. You can check the same from there.  

Frequently Asked Questions

We arrange the locally available AH certified contractors.

Yes you can book the professionals for repairing work also.